    Interconnector Operating Licence – Cap and Floor

    Consultation is now closed

    The CRU has today published a consultation on the draft text for an Interconnector Operating Licence for an interconnector operating with a Cap and Floor regime, such as that described in CRU/21/114 for the Greenlink Interconnector. The licence mirrors the existing EIDAC licence as closely as possible and will apply to future interconnectors developed under 16A(b) of the Electricity Regulation Act 1999 (as amended) (ERA) where a CRU Cap and Floor regime is applied.

     

    The CRU welcomes comments on this draft, to be sent to Lucy Cradden (lcradden@cru.ie) before 31st December 2021.

    Contact Name:
    Lucy Cradden
    Contact Email:
    lcradden@cru.ie

    Round