Published Date: 17 Oct 2018

Sectors:
  • Electricity & Gas Icon
    Electricity & Gas

Dublin Region Level 2 Locational Capacity Constraints for the upcoming T-4 Capacity Auction

The CRU has, on 4 October 2019, published letters which it has issued to EirGrid and ESBN on 3 October 2019 with directions to issue a connection offer to any generator located within the Dublin region Level 2 Locational Capacity Constraint area that is successful in the T-4 capacity auction for 2023/24 taking account of certain considerations.The CRU letter is in response to an EirGrid letter which noted that while it is currently expected that demand requirements in the Dublin region will be met, there remains the potential for security of supply issues in the region. This follows similar letters of direction issued last year related to the T-4 capacity auction for 2022/23.

2019

Document Icon

CRU19124a CRU letter to EirGrid of 3 October 2019 re Dublin Region Level 2 Locational Capacity Constraints

2019

Document Icon

CRU19124b CRU Letter to ESBN of 3 October 2019 re Dublin Region Level 2 Locational Capacity Constraints

2019

Document Icon

CRU19124c EirGrid Letter to CRU of 27 September 2019 re Dublin Region Level 2 Locational Capacity Constraints

Round

2019

Document Icon

CRU19066 CRU Letter to Eirgrid of the 31st May 2019 re Dublin Region Locational Capacity Constraint Direction

2019

Document Icon

CRU19067 CRU Letter to ESBN of the 31st May 2019 re Dublin Region Locational Capacity Constraint Direction

2018

Document Icon

CRU18229a CRU Letter to EirGrid of the 17th October 2018 re Dublin Region Level 2 Locational Capacity

2018

Document Icon

CRU18229b CRU Letter to ESBN of the 17th October 2018 re Dublin Region Level 2 Locational Capacity

2018

Document Icon

CRU18229c EirGrid Letter to CRU of the 4th October 2018 re Dublin Region Level 2 Locational Capacity