Published Date: 17 Oct 2018

Sectors:
  • Electricity & Gas Icon
    Electricity & Gas

Dublin Region Level 2 Locational Capacity Constraints for the upcoming T-4 Capacity Auction

The CRU has, on 4 June 2019, published letters which it has issued to Eirgrid and ESBN providing clarity on directions given in October 2018 to issue a connection offer to any generator located within the Dublin regional Level 2 Locational Capacity Constraint area that is successful in the T-4 capacity auction for 2022/2023.

2019

Document Icon

CRU19066 CRU Letter to Eirgrid of the 31st May 2019 re Dublin Region Locational Capacity Constraint Direction

2019

Document Icon

CRU19067 CRU Letter to ESBN of the 31st May 2019 re Dublin Region Locational Capacity Constraint Direction

Round 1

2018

Document Icon

CRU18229a CRU Letter to EirGrid of the 17th October 2018 re Dublin Region Level 2 Locational Capacity

2018

Document Icon

CRU18229b CRU Letter to ESBN of the 17th October 2018 re Dublin Region Level 2 Locational Capacity

2018

Document Icon

CRU18229c EirGrid Letter to CRU of the 4th October 2018 re Dublin Region Level 2 Locational Capacity