Published Date: 20 Feb 2014

Sectors:
  • Electricity & Gas Icon
    Electricity & Gas

Access Tariffs and Financing the Gas Transmission System

The CER today, 20th  February
2014, wishes to notify industry that the Within-Day Capacity Direction aspect
of its decision on “Access Tariffs and Financing the Gas Transmission System”
(CER/13/191) has been rescinded by the Commission and therefore will not be
implemented. 


Accordingly, the current provisions in the
Gaslink Code of Operations relating to within-day capacity will remain
unchanged, and this product will continue to be available at the exit up to
03:00 on the gas day (Day D).

A CER note on this issue is provided below,
along with correspondence from the Electricity Association of Ireland (which is
referenced in the note).   

 

Round

2013

Document Icon

Oxera Note Removal of Secondary Capacity Transfers 170713 SUMMARY

2013

Document Icon

Deferral of Implementation of Within Day Capacity Purchases at the Exit (Ref: CER13191)

2013

Document Icon

Access Tariffs and Financing Gas Transmission System Presentation

2013

Document Icon

Access Tariffs and and Financing the Gas Transmission Sym

2013

Document Icon

CER13307 Within Day Gas Capacity Direction and High Court Proceedings

2013

Document Icon

Access Tariffs and Financing the Gas Transmission System Decision

Round

Round