Electricity & Gas
ESB Response to CER09044
Decision Paper Treatment of Small, Renewable and Low Carbon Generators outside the GPA
CER advises that it has today, 13th March 2015, published a decision under the non-GPA Policy.. CER has directed EirGrid under CER/09/099 "Treatment of Small, Renewable and Low Carbon Generators outside the Group Processing Approach", to offer a grid connection to Kilpaddoge Energy Ltd for connection of a windfarm to EG's 220 kV substation at Kilpaddoge. The connection is offered under the Experimental/Research public interest criterion. The wind farm will use General Electric turbines with 200 kW batteries installed and integrated with each turbine giving an installed capacity of 2.6MW of batteries.