Published Date: 07 Nov 2017

Sectors:
  • Customer Care Icon
    Customer Care
  • Safety Icon
    Safety

Proposed Decision on the Approval of Charges by Safe Electric

The CRU has today,  07 November 2017,  published its final decision on the approval of charges by Safe Electric. The CRU grants approval to Safe Electric to impose direct inspection charges, at the discretion of the Safe Electric Chief Inspector, on RECs that require higher levels of monitoring as already provided for in Section B 3.2.6 of the Electrical Safety Supervisory Criteria Document (CER/16/001).

Contact Name:
Ciarán O'Shaughnessy
Contact Email:
coshaughnessy@cru.ie

Round

2017

Document Icon

CER17150 Proposed Decision Paper Safe Electric Inspection