Draft EirGrid Transmission Development Plan 2020-2029

Consultation is now closed

In accordance with Condition 8 of EirGrid’s TSO Licence, the CRU approved EirGrid’s Transmission Development Plan (TDP) 2020-2029 on 6 October 2021. The TDP was published on the EirGrid website alongside the TDP 2020-2029 Consultation Report and the TDP 2020-2029 Environment Appraisal Report. This follows our consultation on the draft TDP from 23 April – 21 May 2021.

 