Published Date: 13 Mar 2015

Sectors:
  • Electricity & Gas Icon
    Electricity & Gas

Decision Paper Treatment of Small, Renewable and Low Carbon Generators outside the GPA

CER advises that it has today, 13th March 2015, published a decision under the non-GPA Policy..   
CER has directed EirGrid under CER/09/099 “Treatment of Small, Renewable and Low Carbon Generators outside the Group Processing Approach”, to offer a grid connection to Kilpaddoge Energy Ltd for connection of a windfarm to EG’s 220 kV substation at Kilpaddoge.  The connection is offered under the Experimental/Research public interest criterion. The wind farm will use General Electric turbines with 200 kW batteries installed and integrated with each turbine giving an installed capacity of 2.6MW of batteries.  
Contact Name:
distribution@cer.ie

Round

2009

Document Icon

Treatment Of Small Renewable and Low Carbon Generators

2009

Document Icon

Sustainable Energy Association Response to CER 09044

2009

Document Icon

Treatment of Small Renewable and Low Carbon Generators outside the GPA